Site progress in London: Heath House
— 25 June 2025 by James Chapman and Magnus Strom
— 25 June 2025 by James Chapman and Magnus Strom
We're onto the next stage of the construction of a 4-storey contemporary home in London, and the transformation is well underway.
The reinforced waterproof concrete basement – a key structural feature – is now complete, including external waterproofing layers.
External landscaping, groundwork, and drainage installation have begun.
Meanwhile, the main steel frame is rising, with the single-storey garage and the garden pool wing already taking shape.
It’s always exciting to see a design evolve from concept to reality. Stay tuned for more behind-the-scenes updates as we continue to bring this exceptional home to life.
Timelapse provided by: Griggs Homes